Tramway branches from the Merchants’ Railway served King Barrow Quarries. By 1861 a branch was carried under a bridge beneath Easton Lane near Verne Yeates. Although the 1863 map only indicates the bridge, maps of 1889 and 1901 show the tramway. At those dates a second tramway branched through a tunnel from Waycroft, while a third tramway entered the quarries from Inmosthay, crossing Easton Lane just north of the limekiln there. The tramways had been lifted by 1927 although the tunnel/bridge under Easton Lane remained.
Loading documents & images
Map
Find a placename, postcode or grid reference
Map layers
Base layers
Info
Record list
Tools
The map is limited to 3000 records per layer so not all records are being displayed for this area. Zoom in to see more.
Tramway branches from the Merchants’ Railway served King Barrow Quarries. By 1861 a branch was carried under a bridge beneath Easton Lane near Verne Yeates. (1) Although the 1863 map only indicates the bridge, (2) maps of 1889 and 1901 show the tramway. At those dates a second tramway branched through a tunnel from Waycroft, while a third tramway entered the quarries from Inmosthay, crossing Easton Lane just north of the limekiln there. (3-4) The tramways had been lifted by 1927 although the tunnel/bridge under Easton Lane remained. (5)
Sources/Archives (5)
<1> SDO10249
Map: 1861. Plan of Lands in the Isle of Portland Dorsetshire, to be purchased by …the War Dept.
Do you have any questions or more information about this record? Please feel free to comment below with your name and email address. All comments are submitted to the website maintainers for moderation, and we aim to respond/publish as soon as possible. Comments, questions and answers that may be helpful to other users will be retained and displayed along with the name you supply. The email address you supply will never be displayed or shared.
Comments
Insert Link
Report Comment
Max 1000 characters. Plain text only.
Email User
Your message will be emailed to the person who posted this comment.